Pricing and money

The five most expensive words in flooring

Every contractor has heard it on site, usually while already measuring. It means no budget, no timeline and no plan to buy this year, and by the time it gets said you have already paid for the drive, the fuel, the hour on site and the write-up.

Soroush Farokhi, ProfitPlus Media9 min read

The five most expensive words in flooring.

“I’m just curious what it would cost.”

Any contractor reading this has heard that sentence on site, usually while already measuring.

It signals no budget, no timeline and no near-term intention to buy. The homeowner is gathering a number for a decision they may make next year, and the contractor has already spent the drive, the fuel, the site hour and the write-up hour to supply it. None of that is billable.

The industry calls these free estimates. They are not free. They are paid for in the scarcest resource a skilled trades business has, which is the owner’s hours, and they are paid at full cost regardless of outcome.

Add it up once, properly

What follows is an illustration, not a measurement and not anybody’s real figures. The hours are the part worth arguing about. Put your own dollar value on them and run it again.

The lineRoughlyWhy it is real money
Drive there and backMost of an hour in a normal service areaAn hour you cannot sell to anybody else
Fuel and vehicleWhatever your per mile number isCash out the door, tracked or not
On siteAn hour, once measuring and talking are doneThe most expensive hour in the business
Writing it upAnother hour, usually that eveningUnpaid, and it comes out of your family time
Following upThree or four contacts that go nowhereSpread out, which is why nobody counts it

Call it the better part of a working half day, every time. Now multiply by the number of estimates you attended last month that you knew, on the driveway, were never going to buy.

That is not a marketing cost. It is capacity, and it is the same capacity you were thinking of hiring for.

Four different people say those five words

They do not all deserve the same answer, and two of the four are worth having.

  • The planner. Doing it next spring and wants a number for the budget. Real, just early. Give a ballpark, put a date on your own calendar, and call them in February.
  • The price checker. Already holds a quote and wants to know whether it was fair. This is the one that stings, because you are doing unpaid work auditing a competitor. Ask straight out whether they have other numbers already. Most people tell you.
  • The valuer. Selling the house, or arguing with an insurer, and needs a figure on paper. There is no job at the end of it. A written ballpark by email costs ten minutes and is the correct answer.
  • The buyer who cannot say it yet. Genuinely wants the work and is genuinely nervous about the number, so hides behind the word curious because it feels safer than naming a budget. This one buys.

Which is why “never quote a tire kicker” is poor advice. The aim is not to be harder to reach. It is to find out which of the four you have before you load a van.

Start the qualifying before the phone rings

Your inquiry form is doing qualifying work whether you designed it to or not.

Two fields change more than anything you will say on the call: the rough size of the job, and when they want it done. Both as choices rather than empty boxes, because a homeowner will happily pick from a list and will abandon a form that asks them to write a paragraph.

One warning. Every field you add costs you some of the people who would have finished it. That trade is real, so add two and stop. The aim is not to interrogate anybody on a web page. It is to arrive at the call already knowing which of the four conversations you are about to have.

What makes it solvable

What makes this solvable is that the information needed to disqualify that appointment exists before it is booked. Budget, timeline, ownership of the property and the specific product wanted are four questions that take ninety seconds and remove most non-buyers, whether you ask them or whoever books your calendar does.

Here is how to actually ask them.

  1. Budget. “Most jobs like the one you are describing land somewhere between X and Y. Does that sound about where you were thinking, or is it higher than you expected?” Give them the range first so they are choosing rather than confessing.
  2. Timeline. “If you like the number and you like us, are you looking to get this done in the next few weeks, or is it more of a next year thing?” The second half of that question is what makes it safe to answer honestly.
  3. Ownership. “And it is your own place, so you can give us the go ahead yourself?” Ten seconds. Saves entire mornings.
  4. The product. “What are you picturing, and have you seen it anywhere?” Tells you what to bring, who to send, and roughly what the number will be before you arrive.

Two rules for the delivery. Ask them in a conversation rather than as a form, and let them talk between the questions. A qualifying call that sounds like a credit check turns away good buyers, which is a more expensive mistake than the one you were fixing.

Not every inquiry needs a van

The other half of the fix is that there is more than one kind of estimate. Most contractors have exactly one, and send it out for everything.

KindCosts youRight when
A phone ballparkFive minutesTimeline is vague, or budget is unknown
Photos or a video walk roundTwenty minutesSimple room, known product, they are serious
The full site visitHalf a working dayAll four answers are in and the job is real

A ballpark is not a weakness and it does not cost you the job. It costs you five minutes and it tells you, faster than any visit would, whether the two of you are in the same conversation.

How to say no without being unpleasant

Nobody needs to be turned away rudely, and it is worth having the words ready so you are not improvising on the phone.

For the tire kicker: “Happy to give you a ballpark now so you have a number to work with. When you are closer to actually booking it in, call me and I will come out and measure properly.”

For the one who is out of budget: “Honestly, for what you are describing we would be at the higher end and I do not want to waste your afternoon. If the budget changes, or if you want to do it in two stages, come back to me.”

Both of those leave the homeowner with something useful and leave the door open. A surprising number of them come back, because you are the only person who was straight with them.

Where the decision belongs

The decision about whether an estimate is worth attending should be made before the van leaves the yard. Most contractors are still making it on the drive home.

What changes when you move it is not just the hours. It is the calendar. Fewer visits, attended for better reasons, with a homeowner who already knows the rough number and expects you. The close rate on that calendar looks like a different business, and nothing about your selling changed.

If the pattern you are actually living with is estimates going out and nothing coming back, that is the same problem one stage later and it is written up in forty estimates sent, four people answered. The number that puts a price on all of this is cost per booked estimate, and the wider set it belongs to is the five numbers every flooring owner should know.

Common questions

  1. Will I lose jobs by asking about budget on the phone?

    You will lose visits, which is the point, and you will lose a small number of real jobs at the edges. The trade is usually worth it, because the visits you lose are the ones that were never going to convert and the hours come back to you immediately. If you are nervous about it, ask for a range rather than a figure and give them the range first so they are picking rather than confessing.

  2. What if they genuinely do not know what it should cost?

    Most homeowners do not, which is why the question works better as a band than as a blank. Give them three broad bands for the kind of job they described and ask which one they were expecting to be in. Nobody is offended by that and you learn the same thing. If all three make them go quiet, you have just saved yourself a morning.

  3. Should I charge for estimates?

    It is a legitimate model and it works better for some trades than others. What decides it is usually how much design work sits inside the visit. A straightforward supply and fit measure is hard to charge for and easy to qualify for on the phone. A visit that includes drawings, samples and a couple of hours of planning is closer to a service, and charging a fee that comes off the job if they proceed is a fair way to say so.

  4. Is it rude to turn down an estimate request?

    Only if you do it badly. Declining is a normal part of running a trade and homeowners take it far better than contractors expect, provided you give a reason and an alternative. A ballpark over the phone and an offer to come out when their timeline firms up leaves them with something useful and leaves the door open.

  5. They said “just curious” but the job sounds real. Do I go?

    Go, but qualify anyway, because a lot of serious buyers open with that sentence to protect themselves before they name a number. The four questions cost you ninety seconds and they will tell you which one you have. What you should not do is treat the phrase itself as a verdict in either direction. It is a habit of speech, not a statement of intent.

  6. How do I know whether my qualifying is too tight?

    Watch two numbers together rather than one. If booking rate falls and close rate on the visits you do attend rises sharply, the qualifying is working. If both fall, you are turning away real buyers, usually because the questions are being asked like a credit check rather than a conversation. Listen back to three calls and you will normally hear it in the tone rather than in the questions.

Want a second opinion on which of your estimates were never worth attending? Book the 15-minute phone call at /contact and bring last month’s calendar.

All posts